Skip to content

PROFESSIONAL DESIGN

Direct from our Xingyang factory · Projects across China

Membrane structure design that starts from the site and ends in buildable drawings

We develop schemes, forms and details according to site dimensions, use, local wind and snow conditions and budget. An initial standard carport scheme drawing may be free during the limited promotion; detailed drawings, calculations and institute stamping are quoted separately.

Drag to rotate · Scroll to zoom
Written sign-offbefore fabrication starts
5 steps
design process
Your references
welcome
By scope
design outputs
China-wide
projects

Short answer

In short: Design can be commissioned in stages: discuss the site and use, check information, develop a scheme, detail it and confirm in writing before fabrication. Drawings from every stage are not automatically included. Calculation reports and design institute stamping are separately commissioned paid options; deliverables and fees follow the written quotation and contract. Renderings are not construction documents.

Provider: Henan Qingsong Membrane Structure Engineering Co., Ltd.Contract terms prevail

DESIGN OPTIONS

Choose the drawings you need, with fees agreed first

Agree the required drawing type, level of detail, revisions, price and delivery time before work starts. Except for the promotion below, these are paid options and are not standard project inclusions.

LIMITED PROMOTION

Initial standard carport scheme drawing, free during the promotion

Eligible standard carport projects may receive an initial scheme drawing to discuss layout and form. Eligibility, drawing depth and delivery format are confirmed when you inquire. Construction drawings, calculations and stamping are outside this offer.

Ask about eligibility

Specialist paid options

01SEPARATE QUOTE

Structural calculation report

Loads, parameters and calculation scope are set for the project use and site conditions by the relevant professional. Fee, deliverables and timing are agreed separately.

02SEPARATE QUOTE

Design institute stamped drawings

We can coordinate a suitably qualified design institute to stamp drawings within an agreed scope. Feasibility, required information, fee and timing are assessed and confirmed separately.

Other design deliverables you can commission

Scheme drawings

Prepared for the project; initial standard carport schemes may qualify for the promotion above.

Construction drawings

Drawings for construction at the agreed design depth, priced separately.

Renderings

Visualise form, materials and context; they do not replace construction drawings.

Site visualisation

A proposed view based on supplied site photos or information, for reference.

Paid work starts after scope and price are confirmed. Deliverables absent from the quotation or contract are not standard inclusions.

SERVICE SCOPE

Design work available by scope

From layout to fabrication information, design addresses space, loads, materials and site interfaces. Actual work and deliverables follow the quotation.

01

Scheme design

Compare cantilever, symmetric, multi-bay and umbrella forms against parking, seating or walkway needs, and set coverage and column positions.

02

Form design

Discuss membrane shape, colour, graphics and nearby buildings. Renderings or 3D visuals can be commissioned separately.

03

Detailing

Steel sections, connections, fabric cutting and seams, edge cables and trims, and drainage paths, ready for fabrication.

04

Materials and budget

Compare PVC/PVDF grades and steel protection options for cost and durability, and find a fit within budget.

DESIGN CHECKS

Six things we check at the design stage

Solving these on paper costs the least; changing them on site usually means rework.

Coverage and clearance

Vehicle types, foot traffic and fire lanes set the coverage and minimum clear height.

Wind and snow loads

Structure and fabric pretension are checked for the site’s conditions, not copied from another project.

Drainage and slope

Fabric slopes, outlets and discharge routes are designed together to avoid ponding.

Foundations and services

Underground services, existing foundations and paving are checked before columns are placed.

Connections and upkeep

Connections stay accessible for inspection and replacement, keeping later maintenance simple.

Appearance and context

Colour, height and massing suit the surroundings while balancing daylight and shade.

PROCESS

Design steps and possible stage outputs

Each step leaves a record both sides can check.

  1. 1

    Brief

    Agree use, coverage, budget range and timeline.

    Output: Requirement list
  2. 2

    Survey and check

    Site survey, or remote check of owner dimensions and photos.

    Output: Dimensions and site record
  3. 3

    Scheme and form

    Compare structural options; prepare agreed scheme drawings or visuals.

    Output: Agreed scheme outputs
  4. 4

    Detailing

    Develop steelwork, fabric patterns, connections and drainage as agreed.

    Output: Agreed detailing data
  5. 5

    Written sign-off

    Both parties confirm drawing version, materials and scope.

    Output: Signed drawing version

SCOPE & DISCLAIMER

Responsibilities and boundaries

Good design depends on accurate information. These items are confirmed one by one in the quotation and contract.

Responsibilities and boundaries
ItemQingsong providesOwner provides / to be agreed
Site informationSite survey or remote dimension checkAccurate dimensions, underground services, existing foundations and ownership documents
Schemes and visualsScheme drawings, renderings or 3D visuals as quotedConfirm use, direction, budget and deliverable scope
Calculations and stampsAfter separate commission, provide calculations or coordinate a qualified institute for stampingAgree project load needs, documents, responsibilities and separate fees
Design changesFabrication to the confirmed versionChanges after sign-off need written confirmation and may affect time and cost

Design service notes and disclaimer

  1. Renderings and 3D visuals show the intended form. Colour, light, proportion and surroundings may differ from the finished work; confirmed drawings and samples prevail.
  2. Schemes are based on information supplied by the owner. Changes, rework or costs caused by inaccurate information or site conditions that differ from it are agreed separately.
  3. The latest scheme, quotation and drawings confirmed in writing prevail. Verbal discussions are not a basis for fabrication.
  4. Unless the contract says otherwise, the owner handles drawing review, planning approval and other permits.
  5. Design documents we provide are for this project only and may not be reused or passed to a third party for fabrication or construction without written consent.

Calculation reports, design institute stamping and other paid design outputs are not standard inclusions. Depth, deliverables and fees follow the written quotation and contract.

PROJECT BRIEF

Before design starts, prepare these

A site plan or dimensions, intended use (parking spaces, vehicle types, foot traffic), wide site photos, underground services and existing foundations, reference images, budget range and target timeline. The more complete the information, the more accurate the scheme.

Construction and installation

FAQ

Design FAQ

Can’t find your answer? Send photos and a short description and we will get back to you.

Ask a question →
Is there a charge for membrane structure design?

Eligible standard carport projects may receive a free initial scheme drawing during the promotion. Scheme drawings outside the offer, construction drawings, renderings, site visualisations, calculations and institute stamping are paid options quoted before work starts.

Can you copy a reference photo?

It can guide the form. Actual dimensions, structure and connections must be redesigned for your site; a photo cannot be fabricated directly.

Can you provide calculations and stamped drawings?

These can be quoted for a project. Loads and parameters follow the use and site conditions. Institute stamping needs a separate assessment of scope, qualifications, documents and timing; written terms govern.

How long does design take?

It depends on size, complexity and how complete the information is. We give an estimate after the brief; the agreed schedule prevails.

Can the scheme change after sign-off?

Yes, with written confirmation. Changes to parts already in fabrication may add cost or time.

Will the result look exactly like the rendering?

Renderings show form and colour. The finished work is affected by material, light and surroundings and may differ; confirmed drawings and samples prevail.