Factory fabrication
Laser cutting, beam welding, beam forming and anti-corrosion treatment; membrane panels cut, welded and numbered to drawings. Powder coating is an optional upgrade.
EXQUISITE CONSTRUCTION
Xingyang factory fabrication · Own installation crews
Steelwork and membrane are fabricated in our Xingyang factory, shipped by freight or dedicated truck, and installed by our own crews as site conditions allow. Key steps are recorded, and maintenance documents are handed over on completion.

In short: Membrane structure construction usually covers factory fabrication, site preparation and briefing, foundation check, steel erection, membrane installation and tensioning, drainage and trims, then self-inspection and handover. Duration depends on size, form, foundations, weather and site coordination, and follows the contract. Whether foundations, demolition and utility connections are included should be confirmed item by item when quoting.
SERVICE SCOPE
From factory to site, every step follows the confirmed drawing version.
Laser cutting, beam welding, beam forming and anti-corrosion treatment; membrane panels cut, welded and numbered to drawings. Powder coating is an optional upgrade.
Parts packed by type, counted and loaded, shipped by freight or dedicated truck to limit transit damage.
Steel lifting and alignment, membrane installation and tensioning, drainage and trims by our own crews.
Self-inspection, owner acceptance, and handover of as-built and maintenance documents.
QUALITY CHECKPOINTS
"Strict quality control" means specific checks. These are our routine items; each project follows its own plan.
Parts are finished in the factory to drawings, so site work is mainly assembly. This limits dimensional errors and coating damage from on-site cutting and welding.
Factory capabilities →

PROCESS
Each step leaves a record both sides can check.
Confirm drawing version, method and site conditions.
Output: Briefing recordCheck foundation positions, levels and embeds.
Output: Check recordLift, align and tighten the steelwork.
Output: Installation checkInstall and tension membrane; finish connections and trims.
Output: Tension checkSelf-inspect, support acceptance and hand over documents.
Output: As-built documentsSCOPE & DISCLAIMER
Smooth construction needs both sides. These items are set out in the quotation and contract.
| Item | Qingsong provides | Owner provides / to be agreed |
|---|---|---|
| Site conditions | Mobilise on the agreed date | A site ready for work, with access roads and a laydown area |
| Foundations | Provide column and embed details, then check interface dimensions and levels before installation | Usually arranged by the owner, with acceptance records supplied by the foundation contractor, who remains responsible for the work |
| Utilities and systems | Equipment and tools for our work | Site water and power; lighting, EV chargers or solar are agreed separately |
| Services and permits | Work around services shown in supplied records | Underground service records and planning approvals |
Construction scope, timeline and acceptance criteria follow the quotation and contract.
PROJECT BRIEF
Project location and access, who builds the foundations, whether an old canopy must be removed, whether the site can be closed during work, water and power availability, and target start and completion dates.

FAQ
Can’t find your answer? Send photos and a short description and we will get back to you.
Ask a question →It depends on size, form, foundations, weather and site coordination. The quotation gives an estimate; the contract timeline prevails.
The owner usually arranges foundation construction. We can guide column positions and embeds, then check the handover dimensions, levels and acceptance records before installation. The project contract confirms the division of work.
Projects are managed directly from our Xingyang factory; we have no branch offices. Parts ship by freight or dedicated truck, and our own crews travel to site as the project requires.
Phased or scheduled work can be discussed, but people and vehicles must keep out of work and lifting zones. Arrangements are confirmed before mobilisation.
Usually appearance, steel connections and tightness, membrane tension, drainage and document handover; the contract sets the exact items.
Only after our written confirmation. Additions increase loads and change how the structure works; damage from unapproved additions is outside the warranty.