EXQUISITE CONSTRUCTION

Xingyang factory fabrication · Own installation crews

Careful construction: fabricated to confirmed drawings, installed and accepted step by step

Steelwork and membrane are fabricated in our Xingyang factory, shipped by freight or dedicated truck, and installed by our own crews as site conditions allow. Key steps are recorded, and maintenance documents are handed over on completion.

Completed arched membrane canopy over a logistics driveway
Completed arched membrane canopy over a logistics driveway
Factory-madesite work is mainly assembly
Xingyang
factory
Own
install crews
4-stage
quality checks
China-wide
projects

Short answer

In short: Membrane structure construction usually covers factory fabrication, site preparation and briefing, foundation check, steel erection, membrane installation and tensioning, drainage and trims, then self-inspection and handover. Duration depends on size, form, foundations, weather and site coordination, and follows the contract. Whether foundations, demolition and utility connections are included should be confirmed item by item when quoting.

Provider: Henan Qingsong Membrane Structure Engineering Co., Ltd.Contract terms prevail

SERVICE SCOPE

What the construction service covers

From factory to site, every step follows the confirmed drawing version.

01

Factory fabrication

Laser cutting, beam welding, beam forming and anti-corrosion treatment; membrane panels cut, welded and numbered to drawings. Powder coating is an optional upgrade.

02

Packing and transport

Parts packed by type, counted and loaded, shipped by freight or dedicated truck to limit transit damage.

03

Site installation

Steel lifting and alignment, membrane installation and tensioning, drainage and trims by our own crews.

04

Acceptance and handover

Self-inspection, owner acceptance, and handover of as-built and maintenance documents.

QUALITY CHECKPOINTS

Quality checkpoints in four stages

"Strict quality control" means specific checks. These are our routine items; each project follows its own plan.

  1. 01

    Factory fabrication

    • Cut sizes match the drawing version
    • Weld appearance and bolt-hole positions
    • Rust removal and protective coating
    • Membrane seam welds and panel numbering
  2. 02

    Site preparation

    • Drawing and method briefing
    • Foundation position, level and embeds checked
    • Parts and materials counted
    • Hoarding and warning signs in place
  3. 03

    Installation

    • Column plumbness and bolt tightness
    • Even tension without obvious wrinkles
    • Connections, edge cables and trims
    • Drainage slope and outlet positions
  4. 04

    Completion

    • Appearance and overall form
    • Fasteners and connections rechecked
    • Site cleared
    • As-built and maintenance documents handed over

Factory fabrication underpins site quality

Parts are finished in the factory to drawings, so site work is mainly assembly. This limits dimensional errors and coating damage from on-site cutting and welding.

Factory capabilities →
Laser cutting
Laser cutting
Curved beam fabrication
Curved beam fabrication

Site safety and management

  • Work areas are fenced and signed, with exclusion zones during lifting.
  • Work at height uses protective equipment as required by regulations.
  • For sites that stay in use, work areas, hours and vehicle and pedestrian routes are agreed in advance.
  • The site is cleared and temporary works removed on completion.

PROCESS

Construction steps

Each step leaves a record both sides can check.

  1. 1

    Preparation

    Confirm drawing version, method and site conditions.

    Output: Briefing record
  2. 2

    Foundation check

    Check foundation positions, levels and embeds.

    Output: Check record
  3. 3

    Steel erection

    Lift, align and tighten the steelwork.

    Output: Installation check
  4. 4

    Membrane

    Install and tension membrane; finish connections and trims.

    Output: Tension check
  5. 5

    Handover

    Self-inspect, support acceptance and hand over documents.

    Output: As-built documents

SCOPE & DISCLAIMER

Responsibilities and boundaries

Smooth construction needs both sides. These items are set out in the quotation and contract.

Responsibilities and boundaries
ItemQingsong providesOwner provides / to be agreed
Site conditionsMobilise on the agreed dateA site ready for work, with access roads and a laydown area
FoundationsProvide column and embed details, then check interface dimensions and levels before installationUsually arranged by the owner, with acceptance records supplied by the foundation contractor, who remains responsible for the work
Utilities and systemsEquipment and tools for our workSite water and power; lighting, EV chargers or solar are agreed separately
Services and permitsWork around services shown in supplied recordsUnderground service records and planning approvals

Construction notes and disclaimer

  1. The contract sets the timeline. Delays not caused by us, such as severe weather, owner design changes, a site not ready for work or third-party delays, extend the timeline accordingly.
  2. Where site conditions differ from the drawings or owner information, both parties reconfirm the scheme before work continues; resulting costs are agreed separately.
  3. Foundations, embeds, demolition and other work by the owner or a third party remain that party’s responsibility for quality and safety.
  4. After handover, structural changes or added loads such as signs, lights or solar panels without our written confirmation, and any resulting damage, fall outside the warranty.
  5. During construction the owner helps manage people and vehicles on site; non-workers must stay out of the work area.

Construction scope, timeline and acceptance criteria follow the quotation and contract.

PROJECT BRIEF

Before a construction quote, confirm these

Project location and access, who builds the foundations, whether an old canopy must be removed, whether the site can be closed during work, water and power availability, and target start and completion dates.

Membrane structure design

FAQ

Construction FAQ

Can’t find your answer? Send photos and a short description and we will get back to you.

Ask a question →
How long does membrane structure construction take?

It depends on size, form, foundations, weather and site coordination. The quotation gives an estimate; the contract timeline prevails.

Who builds the foundations?

The owner usually arranges foundation construction. We can guide column positions and embeds, then check the handover dimensions, levels and acceptance records before installation. The project contract confirms the division of work.

How do you handle projects outside Henan?

Projects are managed directly from our Xingyang factory; we have no branch offices. Parts ship by freight or dedicated truck, and our own crews travel to site as the project requires.

Can the site stay in use during construction?

Phased or scheduled work can be discussed, but people and vehicles must keep out of work and lifting zones. Arrangements are confirmed before mobilisation.

What does acceptance cover?

Usually appearance, steel connections and tightness, membrane tension, drainage and document handover; the contract sets the exact items.

Can we add lights, solar panels or signs to the canopy later?

Only after our written confirmation. Additions increase loads and change how the structure works; damage from unapproved additions is outside the warranty.