Use an approved revision
Check dimensions, holes, connections and membrane panels together, keeping changes aligned with fabrication schedules.
CUSTOM FABRICATION
Design & fabrication
Confirm drawings, samples and dimensions so supplied components fit the installation plan.

PROJECT OVERVIEW
Custom fabrication supports buyers with a proposal, construction drawings or reference samples who need membrane and steel components. Our factory in Xingyang, Zhengzhou accepts drawing- and sample-based enquiries. Fabrication-only supply differs from design and installation; agree drawing responsibility, material procurement, production scope and site coordination first.
Check dimensions, holes, connections and membrane panels together, keeping changes aligned with fabrication schedules.
Record membrane grades, steel specifications, colours and coatings in procurement and delivery documents.
Coordinate component sections, protective packaging, identification and unloading with the route and installation method.
Check drawings for dimensions, connections, materials and quantities. Relevant parties should confirm missing site interface dimensions before manufacture.
Samples help agree colour, appearance and local details. A material sample cannot establish the structural suitability of an entire canopy; use samples with technical documents.
Membrane edges, installation connections and steel nodes affect one another. Where procurement is split, assign someone to consolidate interface information and check compatibility.
Complex forms and new membranes on existing structures need measurement and detailed design first. Distinguish primary materials, fittings and site adjustments in the supply list.
Specify the destination, permitted vehicles, unloading and storage space. Number components and packaging so the site team can check deliveries in installation order.
Check quantities, condition and documents against the delivery list. Record transit damage or missing items promptly; agree responsibility and method before site modifications or redrilling.
SCOPE & COORDINATION
Use the same scope for proposals, quotations and handover.
| Work item | Discussion and delivery | Conditions to confirm |
|---|---|---|
| Membrane fabrication | Panel and edge fabrication requirements | Cutting details, materials and connections |
| Steelwork fabrication | Components, nodes and surface treatment | Drawings, dimensions and inspection requirements |
| Fittings supply | Connections and installation accessories | Types, quantities and purchasing responsibility |
| Packaging and transport | Component numbering and shipping arrangements | Freight, unloading and delivery acceptance boundaries |
PROJECT JOURNEY
Check drawings, samples and quantities.
Approve materials, connections, finish and supply boundaries.
Produce and inspect against the approved information.
Provide numbered schedules and coordinate transport.
START YOUR PROJECT
Share the location and current requirement so we can review conditions and scope together.
QUESTIONS & ANSWERS
It can start the discussion. Critical dimensions, connections and materials must be documented and confirmed before fabrication.
This can be discussed with support-structure dimensions, connection details and membrane records; a new survey may be needed.
This must be stated in the appointment. Fabricating to drawings, detailing and structural design are separate services.
Have the relevant parties confirm critical interfaces and revisions before fabrication. Supply numbered schedules and check installation against the drawings.