Select for actual use
Describe vehicles, arrivals and dwell times so suppliers can explain compatible configurations and conditions.
EV CHARGER SELECTION
New energy
Match equipment to real vehicles and parking habits, then confirm installation conditions, cables and canopy interfaces.

PROJECT OVERVIEW
Charger procurement needs vehicle-use and site information. Nameplate or promotional ratings alone do not establish achievable charging performance. This page helps owners organise selection and acceptance records. Qingsong coordinates carport structure, fabrication and installation; actual suppliers and contractors confirm charging equipment and electrical works.
Describe vehicles, arrivals and dwell times so suppliers can explain compatible configurations and conditions.
Outdoor, wall-side, under-canopy and converted bays have different interfaces and all need site records.
Check equipment, accessories, platform functions and commissioning documents separately, beyond main-unit quantities.
Compile actual vehicles and use patterns for supplier compatibility checks, stating the intended service range for public facilities.
Relevant designers should compare AC, DC and other configurations against vehicles, power and operation, not appearance or rated power alone.
Check parking, opening the vehicle port, handling cables and departure against equipment position and user space.
Coordinate cabinet doors, maintenance access and cables with columns and drainage. Canopy cover does not replace equipment environmental requirements.
Quotes should allocate main units, accessories, cable and civil works, commissioning and platform services, identifying items requiring site measurement.
Record models, serial numbers, documents and service contacts at handover. Replacement equipment requires renewed interface and use-condition checks.
SCOPE & COORDINATION
Use the same scope for proposals, quotations and handover.
| Work item | Discussion and delivery | Conditions to confirm |
|---|---|---|
| Selection requirements | Vehicles, environment and management conditions | Supplier-confirmed equipment and compatibility |
| Canopy interfaces | Qingsong structure, fabrication and installation coordination | Cover, columns and ancillary fixings |
| Installation works | Equipment space and cable provisions | Electrical, civil, testing and commissioning parties |
| Equipment service | Documents, platform and maintenance needs | Supply assurance, warranty and service terms |
PROJECT JOURNEY
Provide models, dwell patterns and management needs.
Have equipment and electrical teams confirm compatibility and power records.
Align chargers, columns, cables and drainage.
Check schedules, commissioning records and maintenance contacts.
START YOUR PROJECT
Share the location and current requirement so we can review conditions and scope together.
QUESTIONS & ANSWERS
The designer must assess vehicles, supply and dwell needs. A rating does not represent performance for every vehicle.
No. Check equipment suitability, cabling and protection against the actual environment.
Provide equipment and installation details first for design review of loads, connections and access.
Yes, with explicit interface information, delivery checks, installation, commissioning and warranty responsibilities.