Covering a wastewater tank with a membrane structure

Discussing a cover while a tank is being built allows interfaces to be reserved early. Existing tanks require verification of usable components first. The two stages need different information checklists.

Prepare information for the construction stage

Coordinate cover and tank drawings on new projects. For refurbishment, add current measurements and equipment information. Establish drawing revisions first to reduce fabrication-to-site mismatches.

  • Has the tank already been built?
  • Have reserved interfaces been confirmed by all relevant disciplines?

Related articles & projects

View all